Assembly


Get Touch With Us

You can also send us an email and we’ll get in touch shortly, or
Call us - +91 120-4345180

Technology

  • - The simplicity of Aluminium Formwork and the repetitive nature of the assembly process make it possible to accurately programme construction sequences and thus cycle times well in advance.

  • - In addition, this enables the unskilled labour to work with the formwork, therefore reducing the burden on skilled labour when this is in short supply.

  • - On leaving the factory, all panels are clearly labelled to ensure that they are easily identifiable on site and can be smoothly fitted together using the formwork modulation drawings.

Simple Assembly Systems

PIN AND WEDGE SYSTEM


    • - The panels are held in position by a simple pin and wedge system that passes through holes in the outside rib of each panel.

QUICK STRIP PROP HEAD


    • - One of the principal technical features which enables this speed to be attained using a single set of formwork panels is the unique V shaped  prop head which allows the 'quick strip' to take place whilst leaving the propping undisturbed. The deck panels can therefore be reused immediately.

SPEED


    • - The in-situ construction of all walls and partitions reduces the  requirement for follow-on wet trades.

    • - The concrete surface finish produced with the aluminium forms allows achievement of a high quality wall finish without the need for extensive plastering.

    • - Doors and windows are formed in position, with this high degree of precision items such as door and window frames can be directly installed on site with minimal re-sizing required.

QUALITY


    • - High quality Aluminium Formwork panels ensure consistency of dimensions.

    • - On the removal of the Formwork mould, a high quality concrete finish is produced to accurate tolerances and verticality.

    • - The high tolerance of the finish means that no further plastering is required.

    • - Typically a 3mm to 4mm skim coat is applied internally prior to finishing and a 6 mm build up coat prior to laying  tiles.


Necessity of the Aluminium Form work System

  • - Rapid urbanization has resulted in a geometric increase in the housing demand, which cannot be fulfilled using conventional materials and methods of construction.

  • - The traditional or conventional method of construction for  mass  housing  & high rise buildings is comparatively, a slow process and has limited quality control, particularly when a large size project is  involved.

  • - It is therefore obligatory to work out a method or a scheme where the speed and quality of construction are controlled automatically by a systematic approach.

  • - Therefore Aluminium Formwork System (AFS) identified to be suitable  for  Indian conditions for mass housing construction where quality and speed can   be maintained at a reasonably high level

ADJ. Prop

ADJ. Prop

ADJ. Prop

Beam Bottam

Beam Bottam

Beam Bottam

Deck Panel

Deck Panel

Deck Panel

End Beam

End Beam

End Beam

Internal Corner Angle

Internal Corner Angle

Internal-Corner-Angle

Kicker

Kicker

Kicker

Mid Beam

Mid Beam

Mid Beam

Pin

Pin

Pin

Prop Head

Prop Head

Prop Head

Staircase – 3D View

Staircase – 3D View

Staircase – 3D View

Slab Corner

Slab Corner

Slab Corner

Slab Inner Corner

Slab Inner Corner

Slab Inner Corner

Soldier Tie

Soldier Tie

Soldier Tie

Wall Corner

Wall Corner

Wall Corner

Waller Bracket

Waller Bracket

Waller Bracket

Wall Panel

Wall Panel

Wall Panel

Wall Tie

Wall Tie

Wall Tie

Wedge & Pin

Wedge & Pin

Wedge & Pin




BSL Scaffolding widely accepted in almost in all the international markets