Advantages


  • - NO Plastering required.

  • - Savings on overhead expenses due to speedy construction (4 days per floor).

  • - Monolithic crack free structures.

  • - Doesn't require timber or plywood for construction activities.

  • - Casting of walls and slabs possible simultaneously.

  • - Doesn't require skilled labour.

  • - Floor slab forms removed without moving props.

  • - Earthquake resistance of resulting structures increases manifold.

  • - The Formwork is specifically designed to allow rapid construction on all types of architectural layouts.

  • - Total system forms the complete concrete structure.

  • - Custom-designed to suit project requirements.

  • - Unsurpassed  construction  speed.

  • - High quality finish.

  • - Eliminates plastering, saves almost 50 percent construction time.

  • - The system becomes cost effective where there is considerable repetition of floor layouts on a project such as in the case of low cost mass housing.

  • - Panels can be re used up to 280 times.

  • - Erected using unskilled labour.

  • - Requires no cranes or heavy lifting equipment.

  • - Suitable for low as well as high rise  buildings.

  • - No need to use any timber or plywood.

  • - The resulting structures are highly durable and this ensures that the expenditure on maintenance is kept to a minimum.

  • - After the 25 cycles of reusing of our formwork system we will reach the breakeven point of the conventional formwork cost.

  • - Aluminium  formwork  supplied  by other companies  will consist of two  panels.
    i.e. standard panel up to the door level and special panels above the door level. Since there is a joint in the door level, the panels will easily bulge which affects the plumb of the wall/column. But our panels are designed for the full height of the structure which will eliminate the above problem.

  • - The major problem in Aluminium formwork is mismatching of holes. To avoid this we do a moke- up in the factory itself so that all the problems will be eliminated while dispatching the materials.

  • - Sheet panels are generally used in the Aluminium formwork system.  Since  the sheet panels are made by welding  the  rails  on  four  sides  the  joints  will  easily get damaged. To avoid this problem  we  use  450mm  wide  panels  which  are  being made by welding two ‘L’ shaped  extrusions.  So  the  corners  will  be stronger than the sheet   panels.

ADJ. Prop

ADJ. Prop

ADJ. Prop

Beam Bottam

Beam Bottam

Beam Bottam

Deck Panel

Deck Panel

Deck Panel

End Beam

End Beam

End Beam

Internal Corner Angle

Internal Corner Angle

Internal-Corner-Angle

Kicker

Kicker

Kicker

Mid Beam

Mid Beam

Mid Beam

Pin

Pin

Pin

Prop Head

Prop Head

Prop Head

Staircase – 3D View

Staircase – 3D View

Staircase – 3D View

Slab Corner

Slab Corner

Slab Corner

Slab Inner Corner

Slab Inner Corner

Slab Inner Corner

Soldier Tie

Soldier Tie

Soldier Tie

Wall Corner

Wall Corner

Wall Corner

Waller Bracket

Waller Bracket

Waller Bracket

Wall Panel

Wall Panel

Wall Panel

Wall Tie

Wall Tie

Wall Tie

Wedge & Pin

Wedge & Pin

Wedge & Pin




BSL Scaffolding widely accepted in almost in all the international markets